Download Print this page

JC MACHINERY & TOOLS JC-GM-PLUS User Manual page 11

Roof waterproofing membrane welding machine

Advertisement

JC MACHINERY & TOOLS INC.
VI. Welding steps
1. Setting welding parameters (see above).
2. When the temperature reaches the set value.
3. Welding machine positioning.
4. Pull up the positioning handle (12) of the air gun, lift the air gun (19), lower the air nozzle (4) and
make it close to the submerged membrane. Move the air gun to the left to insert the air nozzle into
the overlap membrane and make the air nozzle in place. At this time, the welding machine will walk
automatically for welding.
5. Always pay attention to the position of the guide wheel (13) and adjust it by touching the handle
(24) lightly if it deviates from the position.
6. Pull up the positioning handle (12) of the air gun after welding, move the air nozzle to the right
until it stops, and rotate upward until it is locked.
7. After welding, press the button on the control panel at the same time
and make the air gun in the state of blowing cold air to cool the air nozzle.
8. Turn off the power supply
VI. Routine maintenance
Use steel brush to clean the hot air nozzle.
Clean the air inlet at the back of the hot air blower
___________________________________________________________________
www.jc-tool.com
with the power switch.
info@jc-tool.com
Quality We Trust
and

Advertisement

loading