QC Industries Automation Series Installation & Maintenance Instructions Manual page 8

Table of Contents

Advertisement

Mount Installation
Ensure mount placement on mounting surface allows clearance for drive package.
1
Insert drop in nuts into t-slot.
>
Proceed to correct mounting type.
u Flush Mount
1
Line up mount to drop in nuts.
u Raised Mount
Mounts' foot can be placed facing inward or outward depending on application.
1
Line up mount to drop in nuts.
8
AS65 Conveyors | Installation & Maintenance Instructions
2
x
2
Insert socket head cap
screws through mount and
into drop in nut.
2
Insert socket head cap
screws through mount and
into drop in nut.
2
x
3
Tighten screws to secure
mount to frame.
3
Tighten screws to secure
mount to frame.
2
x
4
Insert screws (not provided)
into desired mounting surface
and tighten.
4
Insert screws (not provided)
into desired mounting surface
and tighten.
2
x

Advertisement

Table of Contents
loading

Related Products for QC Industries Automation Series

This manual is also suitable for:

As65

Table of Contents