QC Industries Automation Series Installation & Maintenance Instructions Manual page 14

Table of Contents

Advertisement

u Installation of New Belt
1
Loop belt over tension release
tail end.
5
Slide other idler pulley into
opposite slot above drive
pulley, pushing the belt up and into
position. (Ensure recess in shaft
is pointed away from mounting
package)
9
Replace and tighten four
screws holding guard on
opposite side.
14
AS65 Conveyors | Installation & Maintenance Instructions
2
Slide belt onto idler end of
conveyor.
6
Tighten adjustment screws
until pulley creates tension on
belt and marks are aligned.
4
x
10
Slide mounting brackets
into place.
3
Slide idler pulley into slot
above motor, pushing the
belt up and into position. (Ensure
recess in shaft is pointed away from
mounting package)
7
Replace guard.
2
x
11
Insert screws through
bracket and into drop in
nuts in frame.
4
Tighten adjustment screws
until pulley creates tension
on belt and marks are aligned.
2
x
8
Replace and tighten both
screws holding guard above
motor.
2
x
12
Tighten screws holding
bracket to conveyor frame.

Advertisement

Table of Contents
loading

Related Products for QC Industries Automation Series

This manual is also suitable for:

As65

Table of Contents