Installation - QC Industries Automation Series Installation & Maintenance Instructions Manual

Table of Contents

Advertisement

Installation

u Check Your Shipment
Before opening the shipment, visually inspect the outside of the crate/box for shipping damage. Carefully unpack the crate/box, inspecting for component damage which
may have occurred inside the packing materials. Contact the carrier and QC Industries regarding any damage that may have occurred during shipment. Check the contents
of your shipment against the supplied packing slip and inform QC Industries of any discrepancies.
u General Sequence of Installation
1
Mount conveyor to stands or
compatible mounting brackets.
u Assistance
If you need assistance, please contact QC Industries customer service department Monday through Friday, 8am-5pm EST at (513) 753-6000. In addition, your local dis-
tributor has been trained at the factory and can provide support in many ways. You can also visit our website - qcconveyors.com - for additional information and technical
documents.
4
AS65 Conveyors | Installation & Maintenance Instructions
2
Attach sides, guides or un-
derside idlers to conveyor and
adjust as needed.
3
Install drive motor to mount-
ing package. (If not already
installed)
4
Lag conveyor to floor / engage
caster locks and inspect
conveyor before use.

Advertisement

Table of Contents
loading

This manual is also suitable for:

As65

Table of Contents