Replace Timer; Replace Motor - NUVIA Signature NW-SIG-948-1.0 Owner's Manual

Dynamic regeneration
Table of Contents

Advertisement

REPLACE TIMER

Meter Cable
1.
Disconnect the meter cable from the
meter. (If flow meter is attached)
Piston Screw
Washer
4.
Remove the piston screw and
washer from the piston rod.
Cover 4X Screws

REPLACE MOTOR

1.
Remove Screws from the back of the valve
and pull the cover
2.
Remove all connections from the
circuit board
3.
Remove the two screws from the motor.
Remove the motor and watch for the pin
under the motor.
4.
Replace the motor, connections and cover
4 X Screws
2.
Remove four screws from the back of
the valve cover
2 X Screws from Powerhead
5.
Remove the two screws from the powerhead as shown
6.
Life the powerhead from the valve body assembly
7.
Replace the powerhead by reverse following the steps in this section
1.
3.
Front Cover
3.
Remove the front cover of the valve.
Front Cover
2.
4.
2X Screws
Powerhead
Assembly
Valve Body
Assembly
Motor
25

Advertisement

Table of Contents
loading

Related Products for NUVIA Signature NW-SIG-948-1.0

Table of Contents