Board Installation - Honeywell NOTIFIER BACNET-GW-3 Installation And Operation Manual

Table of Contents

Advertisement

Installation

2.2 Board Installation

The BACNET-GW-3 may be installed in a CAB-3 or CAB-4 cabinet as shown below.
Board
Tab
Install bracket on 1/2" standoffs. Place the board's
tab in the bracket slot and screw the board to the
top of the standoffs. May be stacked in front of or
behind another board using standoffs of adequate
length to clear the rear board.
Figure 2.1 NFS-320 Series Installation
Screws
Slot
Figure 2.3 CHS-4L Installation
14
Keypad Removed
Bracket Slot
Three Possible Mounting
Positions - Rear Only
BACNET-GW-3 Installation and Operation Manual – P/N LS10014-000NF-E:C6 5/5/2017
Board
Mount in 4th column of the NFS2-640 Series
chassis. Mount chassis to backbox before installing
the board in rear position. May be mounted in front
of another board using standoffs of adequate length
to clear the rear board.
Figure 2.2 NFS2-640 Series Installation
Board Grounding Area
Screws
Figure 2.4 Securing the Board
Board Installation
Mounting Studs
Slot

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents