Boiler Installation; Installation Recommendations - Immergas HERCULES SOLAR 26 2 ErP Instruction And Recommendation Booklet

Table of Contents

Advertisement

1
BOILER
INSTALLATION
1.1 INSTALLATION
RECOMMENDATIONS.
The Hercules Solar 26 2 ErP boiler has been de-
signed uniquely for floor-installation, for heating
and production of DHW in domestic and similar
uses, with the possibility of coupling to a solar
panel system.
In the event the unit is installed in damp places,
one must provide an insulation system under-
neath it, to insulate it from the ground.
The place of installation of the appliance and
relative Immergas accessories must have suitable
features (technical and structural) such to allow
(always in safety, efficiency and comfortable
conditions):
- installation (according to the provisions of the
technical legislation and technical regulations);
- maintenance operations (including scheduled,
periodic, routine and special maintenance);
- removal (to outdoors in the place for loading
and transporting the appliances and compo-
nents) as well as their eventual replacement
with appliances and/or equivalent components.
By varying the type of installation the classifica-
tion of the boiler also varies, precisely:
- Type B
or B
boiler if installed using the
23
53
relevant terminal for air intake directly from
the room in which the boiler has been installed.
- Type C boiler if installed using concentric
pipes or other types of pipes envisioned for
sealed chamber boilers for air intake and expul-
sion of flue gas.
Note: appliance classification is provided in the
depictions of the various installation solutions
shown on the following pages.
Only professionally enabled companies are
authorised to install Immergas gas appliances.
Installation must be carried out according to
regulation standards, current legislation and in
compliance with local technical regulations and
the required technical procedures.
Before installing the appliance, ensure that it is
delivered in perfect condition; if in doubt, contact
the supplier immediately. Packing materials (sta-
ples, nails, plastic bags, polystyrene foam, etc.)
constitute a hazard and must be kept out of the
reach of children. If the appliance is installed in-
side or between cabinets, ensure sufficient space
for normal servicing; therefore it is advisable to
leave clearance of at least 40 cm on the right of
the boiler in order to open the lateral hatch and
a space of 3 cm between the remaining sides of
the boiler and the sides of the cabinet. Leave
adequate space above the boiler for possible
water and flue connections. Keep all flammable
objects away from the appliance (paper, rags,
plastic, polystyrene, etc.).
In the event of malfunctions, faults or incorrect
operation, turn the appliance off and contact an
authorised company (e.g. the Authorised Tech-
nical Assistance centre, which has specifically
trained staff and original spare parts). Do not
attempt to modify or repair the appliance alone.
Failure to comply with the above implies personal
responsibility and invalidates the warranty.
• Installation regulations:
- Installation in places with a fire risk is pro-
hibited (for example: garages, closed parking
stalls), gas appliances and relative flue ducts,
flue exhaust pipes and combustion air intake
pipes.
- Installation is also prohibited in places/en-
vironments that constitute common parts of
office condominiums such as stairs, cellars,
entrance halls, attics, lofts, escape routes,
etc. if they are not located inside technical
compartments under the responsibility of
each individual building and only accessible
to the user (for the features of the technical
compartments, see the technical standards in
force).
Attention: these boilers are used to heat water
to below boiling temperature in atmospheric
pressure.
They must be connected to a central heating
system and domestic hot water circuit suited to
their performance and capacity. They must be
installed in rooms where the temperature can-
not fall below 0°C and must not be exposed to
atmospheric agents.
"Anti-legionella" heat treatment of the Immergas
storage tank (activated by the specific function
present on the predisposed thermoregulatory
systems): during this stage, the temperature of
the water inside the storage tank exceeds 60°C
with a relative risk of burns. Keep this domestic
water treatment under control (and inform the
users) to prevent unforeseeable damage to peo-
ple, animals, things.
N.B.: before starting the solar system, the solar
collector must be covered to protect the ab-
sorber from overheating and the operator from
scalding. The solar circuit must only be filled
when the hydraulic system has been completely
assembled and cannot be started before it has
been possible to eliminate the heat generated by
the solar collector.
Attention: to size the solar system, contact a
qualified heating engineer.
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HERCULES SOLAR 26 2 ErP and is the answer not in the manual?

Questions and answers

Table of Contents