Install Replenishment Tanks - JPI JP-33 Service Manual

Automatic film processor
Table of Contents

Advertisement

Maintenance Program

6) Install replenishment tanks

-
Place replenishment tanks in their proper location under the processor.
-
Connect hoses or insert hoses into tanks. Refer to color codes and picture to prevent error.
-
Color codes of hoses used with the processor
Red: Developer
Blue: Fixer
Clear: Washer (Or Black six-foot hose with ¾ inch fittings).
7) Inspection
Check all hoses and connections for leaks.
Clean any spilled chemicals inside and outside the processor
8) Installation of racks and final testing.
-
Install the cleaned rack in the marked location
Make sure main worm gears are positioned properly on the worm drive.
Lock racks into place
-
Cover all racks.
-
Turn the power on.
Check the operation of the racks and make sure there are no unusual noise, leaks or odors.
-
Place top cover into position.
9) Check for proper operation by running one test film.
JP-33 SERVICE MANUAL
- -
12
- Change

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents