Download Print this page

HANSA Press VKA-110 Operating Instructions Manual page 33

Four-ball tester

Advertisement

Warning! Insert the push rod with the longer upper section pointing upwards to
avoid damage to the connecting cable.
Oberteil = upper section
Make sure that the cable of the load cell is not within the operating range of the balance
scale bar. Then install pos.20, 64 and 21 as described above.
5.4.5 Mounting the stand for the "Option 4" control unit
If not already mounted, fasten the stand for the "Option 4" control unit on the laboratory
table or base frame with four screws.
5.4.6 Mounting the "Option 4" control unit
Fasten the control cabinet with the "Option 4" control unit on the stand with four screws.
5.5 Electrical installation
Warning:
Only qualified electricians and/or persons properly trained in accordance with
electro-technical regulations are permitted to work on, maintain or repair the
electrical system.
33

Advertisement

loading