Carrier Neos 100S Installation And Commissioning Manual page 14

Direct drive refrigeration units
Hide thumbs Also See for Neos 100S:
Table of Contents

Advertisement

Installation & Commissioning Manual:
Neos 100S, 20X, 30S, 35X, 40X, 50X
Refrigerant Hose Installation – Installation Preparation
Lubricate the fitting and O-ring with POE oil.
Insert the connector into the hose.
To avoid damaging to the O-ring, do NOT twist
the fitting during or after insertion into the hose
Crimp the double zinc clamp using the required crimping tool.
You will need to prepare up to 5 refrigerant lines, as indicated:
• Oil return line (all units EXCEPT 20X)
• Discharge line
• Liquid line
• Hot gas line
• Suction line
®
62-11165 Rev D
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents