Download Print this page

Advertisement

Quick Links

MONTAGE TOIT
[ROOF TOP]
-
INITIAL RELEASE
71E0001P10
SYM
REVISION RECORD
NEOS 100S
EVAPORATOR
REFRIGERANT
UNIT MODEL
MODEL
CHARGE
NEOS 100S
MNS 600
1.0 kg # 0.1 [2.2 lb]
MONTAGE CAPUCINE
[ROOF CUT MOUNTING]
MONTAGE FACADE
[NOSE MOUNT]
12-FEB-10
C.S.
APPLICATION
DATE
DATE
ENGRG.
DATE
ENGRG.
DRAWN BY
UNITED
TECHNOLOGIES
CARRIER
TRANSICOLD
CPR SETTING
GAS
0.7 bar # 0.1 [10.3 psi]
R-134A
NOTES:
1- TRUCK BODY
2- INSTALLATION
3- SERVICE
METRIC FORMAT:
TITLE
UNLESS OTHERWISE SPECIFIED
FIRST ANGLE
PROJECTION
DIMENSIONS ARE IN MILLIMETERS WITH
IMPERIAL CONVERSIONS IN [INCHES]
EUROPEAN
(ETO)
TRANSCONTINENTAL
THIS DOCUMENT IS THE PROPERTY OF CAR
OPERATIONS
AND IS DELIVERED UPON THE EXPRESS CO
CARRIER TRANSICOLD INDUSTRIES S.A
BOITE POSTALE 16
CONTENTS WILL NOT BE DISCLOSED OR US
FRANQUEVILLE SAINT PIERRE
CORPORATION'S WRITTEN CONSENT.
76520 BOOS
FRANCE
R.C. ROUEN B 410 041 677
WARNING
READ ALL NOTES PRIOR TO INSTALLATION
1.1- THE TRUCK STRUCTURE MUST BE EVALUATED BY THE TRUCK MANUFACTURER TO
ITS ABILITY TO WITHSTAND THE LOADS IMPOSED BY THE UNIT OVER ITS SERVICE
CARRIER TRANSICOLD DOES NOT CONVEY ANY ENDORSEMENT OR WARRANTY FOR THE
TRUCK'S STRUCTURAL INTEGRITY.
1.2 -UNIT MOUNTING SURFACES OF THE TRUCK THAT CONTACT THE UNIT MOUNTING PADS
UNI-PLANAR TO WITHIN 3 mm [0.12 ] TO PREVENT DISTORTION OF THE UNIT
2.1- THIS REFRIGERATION UNIT HAS BEEN DESIGNED WITH THE SAFETY OF THE
DURING NORMAL OPERATION, ALL MOVING PARTS ARE FULLY ENCLOSED TO
DURING ALL PRE-TRIP INSPECTIONS, DAILY INSPECTIONS AND PROBLEM
YOU MAY BE EXPOSED TO MOVING PARTS.WE ADVISE YOU TO TAKE ALL REQUIRED
GENERAL AND TO WEAR ADEQUATE PROTECTIVE EQUIPMENT (SAFETY GLASSES,
SAFETY SHOES) DURING INSTALLATION AND ALL REPAIRS AND MAINTENANCE
2.2- TAKE EVERY SAFETY MEASURE WHEN ACCESING THE UNIT, USE STANDARDS
PLATEFORM WITH RAILING, SAVETY BELT.
2.3- UNITS ARE DELIVERED UNDER PRESSURE WITH NITROGEN. PLEASE BE SURE THAT
STILL UNDER PRESSURE (IT MEANS THAT THERE IS NO LEAK).
2.4- INSTALLATION AND COMMISSIONING PROCEDURE WILL DESCRIBED ON ELECTRONIC
MANUAL "MODULE INSTALLATION" AVAILABLE FROM WEBSITES.
3.1- IT IS IMPORTANT FOR THE SAFETY AND UPKEEP OF THE REFRIGERATION UNIT
PERIODICALLY PERFORMED ACCORDING TO THE FREQUENCY INDICATED BY THE
(SEE SERVICE MANUAL), SERVICE OPERATIONS AND REPAIRSMUST BE CARRIED OUT
CARRIER SERVICE STATION.
3.2- [ETO ONLY]
GOLDEN COLD SERVICE CONTRACTS : THE PROOF OF OUR COMMITMENT TO YOUR
WITH A CHOISE OF CONTRACTS : FULL SERVICE / ROUTINE MAINTENANCE /
SHEET
INDEX
INSTRUCTION D'INSTALLATION NEOS 100S
[INSTALLATION INSTRUCTIONS NEOS 100S
RIER CORPORATION
SUBMISSION OF THESE DRAWINGS OR DOCU
MENTS
NDITION THAT THE
DOES NOT CONSTITUTE PART PERFORMANCE
OR
ED WITHOUT CARRIER
ACCEPTANCE OF CONTRACT
DETERMINE
LIFE.
MUST BE
AND/OR TRUCK.
MECANICIAN IN MIND.
PREVENTINJURY.
TROUBLESHOOTING,
PRECAUTIONS
GLOVES,
SERVICES ON THE UNIT.
LADDERS, WORKING
THE CIRCUIT IS
TECHNICAL
THAT SERVICING IS
MANUFACTURED
BY APPROVED
PROFITABILITY
EXTENDED WARRANTY.
REV
-
-
SHEET
1
2
DRAWING NO.
REV
-
98-60608
]
SHEET 1 OF 2

Advertisement

loading
Need help?

Need help?

Do you have a question about the NEOS 100S and is the answer not in the manual?

Questions and answers

Summary of Contents for Carrier NEOS 100S

  • Page 1 1.1- THE TRUCK STRUCTURE MUST BE EVALUATED BY THE TRUCK MANUFACTURER TO DETERMINE ITS ABILITY TO WITHSTAND THE LOADS IMPOSED BY THE UNIT OVER ITS SERVICE LIFE. CARRIER TRANSICOLD DOES NOT CONVEY ANY ENDORSEMENT OR WARRANTY FOR THE MONTAGE CAPUCINE MONTAGE TOIT TRUCK'S STRUCTURAL INTEGRITY.
  • Page 2 NEOS 100S Kg [lb] CONDENSER UNIT 48 [106] EVAPORATOR 15 [33] DRAWING NO. METRIC FORMAT: TITLE 22 FEB 10 INSTRUCTION D'INSTALLATION NEOS 100S INITIAL RELEASE 71E0001P10 C.S. UNLESS OTHERWISE SPECIFIED FIRST ANGLE 98-60608 PROJECTION DIMENSIONS ARE IN MILLIMETERS WITH APPLICATION...