Start Of Operation; Unpacking, Transport And Installation; Connect And Switching-On - gbo Medizintechnik Sonostat User Manual

Table of Contents

Advertisement

8

2 Start of Operation

2.1 Unpacking, transport and installation

Check all components for external integrity after unpacking.
Handle all applicators with care. Do not let ultrasonic heads fall down.
The unit may be placed on any flat surface. It must not be placed on the floor. Keep a
wall distance of at least 20 cm. The device should neither be placed in front of
radiators nor should it be covered by pillows or blankets while in operation. The
device is not made for outdoor operation.
The Sonostat corresponds to the regulations DIN EN 60601. It is a device of
protection class I. Within the scope of the Medical Device Directive (MDD) the
ultrasound therapy device belongs to class IIa.
Warning!
Note for use in the clinical area:
The unit is not designed to be operated in places with the inherent risk of
explosions. If it is used in dangerous areas of anesthesia departments, the
possibility of an explosion cannot be excluded.
If the patient and/or the patient cable is directly exposed to a radiator of a
medical device for high frequency heat therapy, damage of the device or
danger to the patient cannot be excluded. As a rule, a clearance distance
of 3 m is sufficient.

2.2 Connect and switching-on

The Sonostat is designed for connection to a mains voltage suitable from 100 to
240V and automatically adjusts to the correct mains voltage.
Independent of the mains voltage, the unit for power frequencies of 50 to 60 Hz is
suitable.
Warning!
To avoid the risk of electric shock, this unit must be connected only to
a supply with protective conductor!
gbo Medizintechnik AG
Sonostat
Version 1.2

Advertisement

Table of Contents
loading

Table of Contents