Summary of Contents for Ingersoll-Rand Multi-Vane 4800 Series
Page 1
Form P5815 Edition 15 December 2008 CCN: 03523545 MULTI–VANE® Air Motors 4800 Series Non-Reversible 4840 Series Reversible Operation and Maintenance Information Operation and Maintenance Information 操作和维护信息 Save These Instructions...
Page 2
This motor is not designed for working in explosive atmospheres. • This motor is not insulated against electric shock. NOTICE The use of other than genuine Ingersoll Rand replacement parts may result in safety hazards, decreased Motor performance and increased • maintenance, and may invalidate all warranties. •...
Page 3
After each 40,000 cycles or one month, whichever occurs first, line to Series 4840 reversible motors, as one motor inlet is inject 1.5 cc of Ingersoll Rand No. 28 Grease into the Grease expelling secondary exhaust air, and therefore must be open to Fitting (60).
When the life of the motor has expired, it is recommended that the motor be disassembled, degreased and parts be separated by material so that they can be recycled. Manuals can be downloaded from www.irtools.com. Refer all communications to the nearest Ingersoll Rand Office or Distributor. 03523545_ed15...
Page 7
Air Motor Exploded Diagram (Dwg. TPB1028) 03523545_ed15...
Page 8
Air Motor Exploded Diagram (Dwg. TPA1349-1) 03523545_ed15...
Page 9
Air Motors Parts List Item Part Description Part Number Item Part Description Part Number • 43 Spindle Planet Gear Bearing (for N ratio) (3) Air Strainer (1 for non-reversible models; 2 for R4800-654 R4800-565 reversible models) 44 Spindle Rear Bearing (for D, K or N ratio) W44-97 2 Backhead Spindle Assembly...
Maintenance Section 3. For P, Q, S or U ratio, support the short hub end of the Gear Head WARNING on the table of an arbor press and press the Gear Head Planet Gear Shafts (54) from the Gear Head. Make certain the Shafts are Always use protective eyewear when performing maintenance pressed out toward the short hub because the holes in the Gear on a motor or operating a motor.
Page 11
10. For P ratio, insert the Rotor Pinion (55) into the center of the Gear Needle Bearing inserting tool Head. This must be done before installing the second Gear in the Gear Head. It cannot be installed after a second Gear is secured in position. 11.
Need help?
Do you have a question about the Multi-Vane 4800 Series and is the answer not in the manual?
Questions and answers