RECEIVING AND UNPACKING

The circuit breaker units are subjected to factory
production testing prior to being packed and
shipped.

ACCEPTANCE INSPECTION

Confirm that the circuit breaker and cell units are
complete, correct as specified and undamaged
from shipment and handling.
Upon receipt of the equipment, do the following:
1) Make an immediate inspection for damage
that might have occurred during shipment. If
damage is discovered, it should be noted
with the carrier prior to accepting the
shipment, if possible.
2) Carefully unpack the equipment sufficiently to
check for missing parts or concealed
damage.
3) Check for the presence of accessories that
are shipped with the circuit breaker and cell:
Charging Handle (Fig. 5)
-
B9 Grease (Fig. 6)
-
-
Control Wire Harness (Fig. 7)
3) Keep the circuit breaker and cell upright.
Never lay the circuit
CAUTION
breaker or cell on its side
or upside down. This may
cause damage.
4) File a claim with the carrier for any damaged
or missing items and immediately notify the
nearest Toshiba representative.
Do not install or energize
WARNING
equipment that has been
damaged. Damaged
equipment can fail during
operation, resulting in fire
and explosion.
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com

RECEIVING, INSPECTION AND HANDLING

Fig. 5 Charging Handle
Fig. 6 B9 Grease
Fig. 7 Control Wire Harness

Advertisement

Table of Contents
loading

Table of Contents