RECEIVING AND UNPACKING

The circuit breaker units are subjected to factory
production testing prior to being packed and
shipped.

ACCEPTANCE INSPECTION

Confirm that the circuit breaker unit is complete,
correct as specified and undamaged from
shipment and handling.
Upon receipt of the equipment, do the following:
1) Make an immediate inspection for damage
that might have occurred during shipment. If
damage is discovered, it should be noted
with the carrier prior to accepting the
shipment, if possible.
2) Carefully unpack the equipment sufficiently to
check for missing parts or concealed
damage.
3) Check for the presence of accessories that
are shipped with the circuit breaker:
-
Charging Handle (shipped loose with
MU and ML type breakers) (Fig. 4)
-
Insulating cylinders (qty-6) (
Fig. 5)
3) Keep the circuit breaker upright.
Never lay the circuit
breaker on its side or
CAUTION
upside down. This may
cause damage.
4) File a claim with the carrier for any damaged
or missing items and immediately notify the
nearest Toshiba representative.
Do not install or energize
WARNING
equipment that has been
damaged. Damaged
equipment can fail during
operation, resulting in fire
and explosion.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
INSTALLATION
Fig. 4 Charging Handle
Fig. 5 Insulating Cylinder

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hv6fs-muHv6fs-ml

Table of Contents