Other connections

Condensate outlet

Cooling, plate heat exchanger and steam humidifica-
tion sections are equipped with stainless condensate
draining trays which terminate in an outlet for the con-
densate draining kit connection. This outlet is provided
with a G1/2" thread. The condensate draining kits are
available as extra ordered optional accessories. A se-
parate condensate draining kit must be used for each
section. The siphon height depends on the total pressu-
re of the fan, and its proper height is essential for good
Picture 10 – condensate outlet
Table 3 – dimensions of seal-pipes
functioning. The type of condensate draining kit must be
designed in the course of the air-handling unit calcula-
tion.
Before the first start-up and after longer shut-down the
seal-pipe must be filled with water through the plastic
plug. The unit can also be equipped with seal-pipe with
a stink trap and spherical valve (only for sections with
underpressure). This type of seal-pipe doesn´t have to
be filled with water before start-up.
Duct connection
Connection of the air handling duct must be done using
elastic connection, which prevents the vibrations from
transfering and enables the duct to be connected to the
unit even if those two components are not co-axial. This
connection should be done in such way that the duct
didn´t deform and burden the inlet opening of unit.
Accessories are mounted according to unit specification
and according to installation instructions of accessory
producer.
Picture 11 – duct connection
Elastic
connection
DV
H...total height of seal-pipe
Air handling units

Connection of electric devices

The wiring and installation of the M&C system elements
must be performed by qualified professionals autho-
rized to perform wiring of the given type of device in
accordance with national standards and regulations
applicable in the country of installation as well as the
Installation and Operating Instructions applicable for
individual components (frequency converters, pressure
and temperature sensors, etc). Before the start up, the
check of electric device must be performed. Before the
start check:
conformity of voltage, frequency and protection with
data on the label of the section
connecting cables of sections
Picture 12 – unit production label
According to type and output power of electric heater on
label of heater section, assign appropriate scheme.
type
output
power