Unit operation – operation regulations ......................11 Regular operation checks ..........................11 Regular inspections ............................11 Spare parts, service ........................13 Spare parts ................................ 13 Service ................................13 Disposal and recycling ............................ 13 Up-to-date version of this document is available at website www.remak.eu...
Air handling units Application, working conditions, construction Information from the producer inserts, cleaning etc.), the sections are equipped with service panels which have the same construction as AeroMaster FP air-handling units are produced stationary panels but they are equipped with handles according to valid czech and european technical and fixed by turning thrust latches.
Air handling units Expedition List of requirements for expedition Picture 3 – installation on a basement (floor) To every air handling FP unit belong: Accompanying technical documentation. Trade technical documentation with scheme of unit FP installation. Device service book. ...
(elastic plastic absorber). above mentioned actions, it´s necessary to contact For safety reasons are service panels covering fan and service technicians of Remak a.s., tel.: 00420 571 877 electric heater casette equipped with additional mecha- 736 or by e-mail: hot.line@remak.cz.
Air handling units Connection of exchangers Direct evaporators Picture 7 – energy supply Picture 9 – connection of evaporators connection of exchangers Single circuit Single circuit air flow direction air flow direction (right type of eva- (left type of eva- porator) porator) Connection of exchangers...
Air handling units Other connections Condensate outlet Connection of electric devices Cooling, plate heat exchanger and steam humidifica- The wiring and installation of the M&C system elements tion sections are equipped with stainless condensate must be performed by qualified professionals autho- draining trays which terminate in an outlet for the con- rized to perform wiring of the given type of device in densate draining kit connection.
Air handling units Other connections Schemes of electric wiring - motors of fans 2 Triple-phase motors (2x, up-to 1,1 kW) 2 Triple-phase motors (2x, up-to 1,1 kW) U1,V1,W1,PE TK1, TK1 U1, V1, W1, PE1 - clamps of triple-phase motor power supply. - clamps of the 1st motor thermocontacts - power supply clamps of the 1st triple- 3ph.-400V/50Hz...
Air handling units Other connections Schemes of electric wiring - electric heaters El. heater type FPVE ../.. El. heater type FPVE ../..S P= 6–31,5 kW P= 6–31,5 kW U, V, W, PE, N U, V, W, PE, N - clamps of electric heater power supply. 3f-400V/50Hz - clamps of electric heater power supply.
state of inlet and outlet duct connection included in the Service book for REMAK devices, where connection of condensate drain kit according to guaranty requirements the first operation elements and connection of cooling circuit of the device must be mentioned.
Air handling units Operation regulations, operation checks Unit operation - operation regulations Picture 15 – change of filtration insert Before putting device in permanent operation the supp- lier of device (mounting firm) must issue operation regu- lations according to draftsman and corresponding with valid regulations.
Spare parts are not delivered with the unit. In case of Guarantee and after guarantee actions can be ordered need they can be ordered at REMAK a.s. or at either at REMAK a.s. or at a regional distributor. a regional distributor. In the order please mention serial...
Page 15
Permission for re-printing or copying of "Installation and service instructions" (either a part or a whole) must be obtained in written form from company REMAK a.s., Zuberská 2601, Rožnov p. R.. This "Installation and service instructions" is exclusive property of company REMAK a.s.. Right for changes reserved.