120V Hard Wire Connection - Napoleon CLEARion Series Installation And Operation Manual

Hide thumbs Also See for CLEARion Series:
Table of Contents

Advertisement

A. Remove the cover plate by removing the 3 screws (Fig. 1). Set screws aside.
Fig. 2
B. Remove the terminal block from the power cord assembly by removing the 2 screws (Fig. 2). Set terminal
block and screws aside; discard power cord assembly.
C. Hard wire appliance (see "120V hard wire connection" and
"240V hard wire connection" sections).
D. Install the small end of the strain relief into the new cover
plate (supplied) using the screws previously removed in
step A (Fig. 3).
3.3

120V hard wire connection

A.
Loosen the securing screw from the terminal block to remove the cord from the terminal block. KEEP 2
WIRE JUMPERS IN THE TERMINAL BLOCK.
B.
Add a strain relief and feed the supply wires through the 7/8" (22mm) hole from the terminal block.
C.
Insert White (N) wire from power supply to the designated (N) slots in the terminal block. Secure by
tightening the screws on the (N) slots. ENSURE JUMPER WIRES ARE SECURED.
D.
Run Black (L1) and Green (G) wires from the power supply to designated slots on the terminal block.
E.
Re-install cover plate.
note:
Leave enough wiring so that the appliance can be removed from the enclosure without disconnecting the
appliance from the power supply.
Terminal Block
Power Cord
Assembly
Fig. 1
TERMINAL BLOCK
WHITE
(N)
BLUE (N1)
GRAY (N2)
(L1)
BLACK
(L2)
RED
GREEN
(G)
electrical information
Strain Relief
Bushing
YELLOW
(JUMPER)
Fig. 3
120V
WHITE (N)
BLACK(L1)
(G)
GREEN
W415-1767 / F / 07.20.18
EN
17

Advertisement

Table of Contents
loading

Table of Contents