Step 3: Unpack The Switch - NETGEAR S350 Series Hardware Installation Manual

8-port gigabit ethernet smart managed pro switch
Hide thumbs Also See for S350 Series:
Table of Contents

Advertisement

S350 Series 8-Port Gigabit Ethernet Smart Managed Pro Switch
You can also take the following steps to prevent damage from electrostatic discharge
(ESD):
• When unpacking a static-sensitive component from its shipping carton, leave it in
the antistatic package until you are ready to install it. Just before unwrapping the
antistatic package, discharge static electricity from your body.
• Before moving a sensitive component, place it in an antistatic container or package.
• Handle all sensitive components in a static-safe area. If possible, use antistatic floor
pads, workbench pads, and an antistatic grounding strap.

Step 3: Unpack the switch

Check the contents of the boxes to make sure that all items are present before installing
the switch.
To check the package contents:
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4. Verify that the package contains the following items:
• Model GS308T:
-
Switch model GS308T
-
DC power adapter (varies by region)
-
Installation guide
• Model GS310TP:
-
Switch model GS310TP
-
DC power adapter with a detachable power cable (varies by region)
-
Installation guide
5. If any item is missing or damaged, contact your local NETGEAR reseller for
replacement.
Installation
23
Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs308tGs310tp

Table of Contents