Chapter 4 Installation - NETGEAR S350 Series Hardware Installation Manual

8-port gigabit ethernet smart managed pro switch
Hide thumbs Also See for S350 Series:
Table of Contents

Advertisement

4
Installation
This chapter describes the installation procedures for the switch. Switch installation
involves the steps described in the following sections:
• Step 1: Prepare the site
• Step 2: Protect against electrostatic discharge
• Step 3: Unpack the switch
• Step 4: Install the switch on a flat surface
• Optional Step 5: Install SFP transceiver modules (model GS310TP)
• Step 6: Connect devices to the switch
• Step 7: Check the installation
• Step 8: Apply power and check the LEDs
• Step 9: Manage the switch
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs308tGs310tp

Table of Contents