Page 2
Quick guide Navigation Ok button (confirm/select) Back button (back/undo/exit) Control knob (move/increase/reduce) A detailed explanation of the button functions can be found on page 42. How to scroll through menus and make different settings is described on page 43. Set the indoor climate INDOOR CLIMATE HOT WATER MY INSTALLATION...
Menu system 8 Control - Menus Menu 1 - INDOOR CLIMATE Menu 2 - HOT WATER Menu 3 - INFO Menu 4 - MY SYSTEM Menu 5 - SERVICE 9 Service Service actions NIBE VVM 310 Table of Contents |...
Read the User Manual. must be inclined along its entire length to prevent water pockets. It must also be frost-proof. The over- flow pipe must be visible and its outlet must be open. Chapter 1 | Important information NIBE VVM 310...
Page 5
Improper disposal of the product by the user results in administrative penalties in accordance with current legis- lation. Serial number Caution You need the product's (14 digit) serial number for servicing and support. NIBE VVM 310 Chapter 1 | Important information...
Page 6
Safety valve Electricity (page 24) Connected communication Circuit fuses Fuses, indoor module Fuses property Outside sensor Room sensor Current sensor Safety breaker Earth circuit-breaker Setting of emergency mode thermostat Miscellaneous Docked to Chapter 1 | Important information NIBE VVM 310...
All service on VVM 310 can be carried out from the front. 30 - 50 mm NOTE Leave 10 – 25 mm free space between the in- door module and the wall behind for routing of cables and pipes. NIBE VVM 310 Chapter 2 | Delivery and handling...
1. Remove the screws from the upper and lower edges. 2. Twist the cover slightly outward. 3. Move the hatch backwards and slightly to the side. 4. Pull the cover to one side. 5. Pull the hatch forwards. Chapter 2 | Delivery and handling NIBE VVM 310...
AA3-X4 Terminal block, current sensors Display unit AA4-XJ3 USB socket AA4-XJ4 Service socket Extra relay circuit board BF1* Energy meter *Applies to VVM 310 EMK. Available as accessory EMK 310 for other markets. Chapter 3 | Indoor module's design NIBE VVM 310...
Expansion vessel not supplied with the product. electrical components. Equip the product with an expansion vessel. NIBE recommends installing VVM 310 as close to the heat pump as possible for optimum comfort. For further The pre-pressure of the pressure expansion vessel must...
Page 12
VVM 310 connects to the climate system. Venting valve VVM 310 is designed for connection and communication with a compatible NIBE air/water heat pump, see page Shut-off valve 14, which together make up a complete heating install- ation.
Connection, solar heating system supply line Ø22 XL14 Connection, solar heating system return line Ø22 XL18 Connection, docking in high temp Ø22 mm XL19 Connection, docking out high temp Ø22 mm XL30 Connection, expansion tank G20 int. NIBE VVM 310 Chapter 4 | Pipe connections...
AMS 10-16 + HBS 05-16 VVM 310 can be connected to extra water heater, see below. Further option information is available at nibe.eu and in the respective assembly instructions for the accessories used. See page 63 for the list of the accessories that can be used with VVM 310.
Page 15
Filterball Safety valve, heating medium Pump, solar External heat source (Oil, gas, pellets or wood fired boiler with shunt valve) *Energy meter (BF1) included in VVM 310 EMK. AA25 Unit box with accessory card BT52 Temperature sensor, boiler Accumulator tank...
Page 16
(XL8) with the pipe out to the heat pump XL9. fitted, or a thermostat must be removed to ensure suffi- -EB15-FL2 cient flow. -EB15 -CM1 -EB15-FL2 -EB15 -XL1 -CM1 -XL2 -XL8 -XL9 -EB15 -EB15 Chapter 4 | Pipe connections NIBE VVM 310...
Page 18
-QZ2 -FL10 -XL2 -QM1 *Energy meter (BF1) included in VVM 310 EMK. Available as access- ory EMK 310 for other markets. Connecting EMK 300 Connecting energy measurement kit EMK 300 (BF2) to VVM 310. EMK 300 is connected between the air/water heat pump and VVM 310, although before the first ac- cessory.
Page 19
For connection to solar installation, the SCA 35 accessory is required, see "Accessories" on page 63. -EB15 -FL2 -EB15 -CM1 -XL13 -XL14 -EP30 -BT53 -EB15 -EP8 -AA5 -CM5 -GP30 -RM4 -RM3 -QM40 -EB101 -GP4 -FL4 -EP5 -XL1 -GP4 -QZ2 -OM44 -FL10 -XL2 -OM45 -OM43 -QM1 NIBE VVM 310 Chapter 4 | Pipe connections...
Page 20
The POOL 310 accessory is required for this connection. -CL11 -EP5 -BT51 -GP9 -HQ4 -AA25 -CL11 -GP12 -EB15 -FL2 -EB15 -CM1 -CL11-QN19 -EB15 -QM40 -EB101 -XL1 -QZ2 -FL10 -XL2 -QM1 Chapter 4 | Pipe connections NIBE VVM 310...
Page 21
The demand on F135 is controlled by the indoor module in the system. The pump and fan speed are also controlled from the menu in the indoor module. -AZ10 -AZ10 -HQ1 -GP10 -QM42 -QM43 -EB15-FL2 -EB15 -CM1 -RM1 -RM1 -EB15 -QM40 -EB101 -XL1 -QZ2 -FL10 -XL2 -QM1 NIBE VVM 310 Chapter 4 | Pipe connections...
Otherwise the temperature limiter, thermostat and the immer- sion heater can be damaged. NOTE If the supply cable is damaged, only NIBE, its service representative or similar authorised person may replace it to prevent any danger and damage.
Page 25
NOTE The cover for the input card is opened without a tool. 1. Insert the screwdriver (A) and pry the catch carefully downwards (B). 2. Angle out the cover and remove it. NIBE VVM 310 Chapter 5 | Electrical connections...
Page 26
1. Insert the screwdriver (A) and pry the catch carefully downwards (B). 2. Angle out the cover and remove it. Cable lock Use a suitable tool to release/lock cables in the indoor module terminal blocks. Chapter 5 | Electrical connections NIBE VVM 310...
0.5 mm² cable area. ure. If a conduit is used it must be sealed to prevent condens- ation in the sensor capsule. External VVM 310 VVM 310 VVM 310 AA3-X6 AA3-X6 NIBE VVM 310 Chapter 5 | Electrical connections...
If the currents are higher than the set fuse size, the power step is not allowed to cut in. See chapter Load monitor on page För frånluftsvärme! NIBE VVM 310 Chapter 5 | Electrical connections...
Page 30
This means that the maximum power output (maximum installed electrical output for heating) can be locked in menu 5.1.13. To then change the maximum power out- put, parts of the product must be replaced. Chapter 5 | Electrical connections NIBE VVM 310...
VVM 310 Caution -T1 -T2 -T3 Some of the following functions can also be activated and scheduled via menu settings. VVM 310 VVM 310 1 2 3 4 AA3-X4 AA3-X4 NIBE VVM 310 Chapter 5 | Electrical connections...
Page 32
6 on the input board (3). ation. "SG Ready" is a smart form of tariff control, through which your electricity supplier can affect the indoor, hot water and/or pool temperatures (if applicable) or simply Chapter 5 | Electrical connections NIBE VVM 310...
Page 33
Mark up any junction boxes with warnings for external voltage. In systems with both under floor heating and radiators, NIBE ECS 40/41 should be used for optimum operation. Switch for external blocking of hot water In cases where external blocking of hot water is used, this can be connected to terminal block X6 on the input board (AA3), which is positioned behind the front cover.
Page 34
(1) air/water heat pump. This is ensured in the docking menu, if present. If the “active cooling 4-pipes” accessory has been activ- ated, the function is switched off. Cooling is then oper- ated from the accessory instead. Chapter 5 | Electrical connections NIBE VVM 310...
". 2. Check that the drain valve is fully closed and that the temperature limiter (FD1) has not deployed. 3. Compatible NIBE air/water heat pump must be equipped with a control board with display that has VVM 310 at least the software version as listed on page 14.
Page 37
1. Use the control knob to select the help symbol. 2. Press the OK button. The help text often consists of several windows that you can scroll between using the control knob. NIBE VVM 310 Chapter 6 | Commissioning and adjusting...
Page 38
(QM20). When venting, VVM 310 must be off. Available pressure circulation pump, GP1 Tillgängligt tryck Pressure (kPa) (kPa) 100% 200 400 600 800 1 000 1 200 1 400 1 600 Vattenflöde (l/h) Flow (l/h) Chapter 6 | Commissioning and adjusting NIBE VVM 310...
If you only have one climate system, the num- ber of the curve is already marked when the menu window opens. 1. Select the climate system (if more than one) for which the curve is to be changed. NIBE VVM 310 Chapter 6 | Commissioning and adjusting...
SG Ready SG Ready This function can only be used in mains networks that support the "SG Ready"-standard . Make settings for the function "SG Ready" here. Chapter 6 | Commissioning and adjusting NIBE VVM 310...
Page 41
With overcapacity mode on "SG Ready", the desired pool temperature (start and stop temperature) is increased by 2 °C. NOTE The function must be connected to two AUX inputs and activated in menu 5.4. NIBE VVM 310 Chapter 6 | Commissioning and adjusting...
The control knob can be turned to the right or left. You can: ■ scroll in menus and between options. ■ increase and decrease the values. ■ change page in multiple page instructions (for example help text and service info). Chapter 7 | Control - Introduction NIBE VVM 310...
Setting time, date, language, display, operating mode etc. See information in the help menu or user manual. Accessory NIBE F135 needed. Menu 5 - SERVICE This symbol indicates whether solar heating is active.
Page 44
Back button. marked. 2. Press the OK button to skip between the steps in the start guide. If the start guide is left on this page it closes automatically in 60 min Chapter 7 | Control - Introduction NIBE VVM 310...
Page 45
1. Use the control knob to select the help symbol. 2. Press the OK button. The help text often consists of several windows that you can scroll between using the control knob. NIBE VVM 310 Chapter 7 | Control - Introduction...
Menu 3 - INFO 3 - INFO 3.1 - service info 3.2 - compressor info 3.3 - add. heat info 3.4 - alarm log 3.5 - indoor temp. log * Accessories are needed. NIBE VVM 310 Chapter 8 | Control - Menus...
4.9.2 - auto mode setting 4.9.3 - degree minute setting 4.9.4 - factory setting user 4.9.5 - schedule blocking * Accessory needed. Descriptions of menu 1–4 can be found in the user handbook. Chapter 8 | Control - Menus NIBE VVM 310...
5.11.1.1 - heat pump 5.11.1.2 - charge pump (GP12) 5.12 - country * Accessory needed. Go to the main menu and hold the Back button in for 7 seconds to access the Service menu. NIBE VVM 310 Chapter 8 | Control - Menus...
Page 50
If no alarm action is selected, it can result in Here you set the start and stop temperature of the hot higher energy consumption in the event of an water for the different comfort options in menu 2.2. alarm. Chapter 8 | Control - Menus NIBE VVM 310...
Page 51
Factory setting: 16 A in the display. If temperature difference lies outside the parameters, adjust the flow for the charge pump by reducing/increas- ing the pressure, until the test is OK. NIBE VVM 310 Chapter 8 | Control - Menus...
Page 52
You can either mark the alternative in the list or use the automatic function "search installed acc.". search installed acc. Mark “search installed acc." and press the OK button to automatically find connected accessories for VVM 310. Chapter 8 | Control - Menus NIBE VVM 310...
Page 54
Set how often the filter alarm must be displayed. Menu 5.3.18 - pool See the installation instructions for ERS for function de- Here you select which pump to use in the system. scription. Chapter 8 | Control - Menus NIBE VVM 310...
Page 55
40 °C 18) and output AA3-X7 (on the input circuit board). temp. period 4 45 C temp. period 5 40 °C temp. period 6 30 °C temp. period 7 20 °C NIBE VVM 310 Chapter 8 | Control - Menus...
Page 56
Speed in standby mode (only used if "auto" has been selected for "Operating mode") means the charge pump operates at the set speed during the time when there is neither a need for compressor operation nor additional heat. Chapter 8 | Control - Menus NIBE VVM 310...
Page 57
Language settings can be made regardless of this selec- tion. NOTE This option locks after 24 hours, restart of dis- play or program updating. NIBE VVM 310 Chapter 8 | Control - Menus...
351.0 3.256 with the necessary expertise. 251.6 3.240 When replacing components on VVM 310 only 182.5 3.218 replacement parts from NIBE may be used. 133.8 3.189 99.22 3.150 Emergency mode 74.32 3.105 Emergency mode is used in event of operational interfer- 56.20...
VVM 310. VVM 310 from NIBE. INDOOR CLIMATE HOT WATER The fact box at the top of the display shows information (always in English) of the most probable update that the update software has selected form the USB memory.
Page 60
3. The present values from VVM 310 are saved in a file in the USB memory at the set interval until “activ- ated" is unticked. NOTE Untick "activated" before removing the USB memory. Chapter 9 | Service NIBE VVM 310...
Enter menu 1.1 "temperature" and adjust the offset – heating curve up. If the room temperature is only low in cold weather the curve slope in menu 1.9.1 "heating curve" needs adjusting up. NIBE VVM 310 Chapter 10 | Disturbances in comfort...
Page 62
There is no heating requirement. ■ VVM 310 does not call on heating or hot water. – Alarm tripped. ■ VVM 310 temporarily blocked, see menu 3.2 com- – pressor information. Chapter 10 | Disturbances in comfort NIBE VVM 310...
Part no. 067 248 Communications module SMS 40 Air/water heat pump When there is no internet connection, you can use the ac- NIBE SPLIT HBS 05 cessory SMS 40 to control VVM 310 via SMS. AMS 10-6 HBS 05-6 Part no 067 073 Part no.
Page 64
Part no. 069 122 Communications module OPT 10 OPT 10 is used to enable connection and control of gas boiler NIBE GBM 10-15. Part no. 067 513 Humidity sensor HTS 40 This accessory is used to show and regulate humidity and temperatures during both heating and cooling operation.
Hot water capacity Tap flow Varmvattenkapacitet VVM310 (litres/minute) Tappflöde (l/m) Economy Ekonomi Normal Normal Economy Ekonomi Normal Normal Volym varmvatten (liter) Volume hot water (litres) Chapter 12 | Technical data NIBE VVM 310...
Tel: +7 831 419 57 06 E-mail: kuzmin@evan.ru www.nibe-evan.ru NIBE AB Sweden, Box 14, Hannabadsvägen 5, SE-285 21 Markaryd Tel: +46 (0)433 73 000 E-mail: info@nibe.se www.nibe.se For countries not mention in this list, please contact Nibe Sweden or check www.nibe.eu for more information.
Need help?
Do you have a question about the VVM 310 EMK and is the answer not in the manual?
Questions and answers