Maintenance; Routine Maintenance Procedures; Battery Operation; Disposal - BD Alaris GW 800 Series Directions For Use Manual

Volumetric pumps
Hide thumbs Also See for Alaris GW 800 Series:
Table of Contents

Advertisement

Maintenance

Routine Maintenance Procedures

To ensure that this Pump remains in good operating condition, it is important to keep it clean and carry out the routine maintenance
procedures described below . All servicing should only be performed by Qualified Service Personnel with reference to the Technical
Service Manual (TSM) .
Circuit diagrams and components parts lists and all other servicing information which will assist the qualified service engineer in
performing repair of the parts designated as repairable are available upon request from BD .
If the Pump is dropped, damaged, subjected to excessive moisture or high temperature, immediately take it out of
w
service for examination by Qualified Service Personnel.
All preventative and corrective maintenance and all such activities shall be performed at a compliant work place
in accordance with the information supplied. BD will not be responsible should any of these actions be performed
outside the instructions or information supplied by BD.
Interval
As per hospital policy
Each usage
Before the transfer of the Pump to
a new patient and as required
Please refer to Technical Service Manual for calibration procedures. The units of measurement used in the calibration
w
procedure are standard SI (The International System of Units) units.
Keep this Manual for future reference during the Pump's operational life.
w
It is important to ensure that you only refer to the most recent version of the Directions for Use and Technical Service
Manual for your BD products. These documents are referenced on bd.com. Paper copies of the Directions For Use can
be obtained free of charge by contacting your local BD representative. An estimated delivery time will be provided
when the order is placed.

Battery Operation

The internal rechargeable battery allows continued operation when the AC power is unavailable, for example during patient transfer or
AC power failure . The infusion time on battery is rate dependant, see 'Specifications' section of the DFU . From the battery low alarm it
will take about 24 hours to fully recharge when reconnected to the AC power supply, whether the Pump is in use or not . The battery is
automatically charged during AC operation and whenever the Pump is connected to the AC power supply and the AC power indicator is
illuminated .
The battery is maintenance free, sealed Nickel Metal Hydride and requires no routine servicing . However, to achieve optimum operation,
ensure that the battery is fully recharged after full discharge, before storage, and at regular 3 month intervals during storage .
Charge retention will eventually degrade . Where retention is critical the internal battery should be replaced every 3 years .
It is recommended that only Qualified Service Personnel replaces the battery . For further information regarding the replacement of
batteries refer to the Technical Service Manual .
Any use of battery packs that are not manufactured by BD in the Alaris Volumetric Pump is at your sole risk, and BD does not provide any
warranty for or endorsement on any battery packs that are not manufactured by BD . BD product warranty shall not apply in the event
the Alaris Volumetric Pump has suffered damage or premature wear, or malfunctions or otherwise operates incorrectly, as a result of use
with a battery pack that is not manufactured by BD .

Disposal

Information on Disposal for Users of Waste Electrical & Electronic Equipment
U
This
symbol on the product and/or accompanying documents means that used electrical and electronic products should not be
mixed with household waste .
If you wish to discard electrical and electronic equipment, please contact your BD affiliate office or distributor for further information .
Disposing of this product correctly will help to save valuable resources and prevent any potential negative effects on human health and
the environment which could otherwise arise from inappropriate waste handling .
Information on Disposal in Countries outside the European Union
U
This
symbol is only valid in the European Union . The product should be disposed of taking environmental factors into consideration .
To ensure no risk or hazard, remove the internal rechargeable battery and the Nickel Metal Hydride battery from the control board and
dispose of as outlined by the local country regulations . All other components can be safely disposed of as per local regulations .
Routine Maintenance Procedure
Thoroughly clean external surfaces of the Pump before and after prolonged period of storage .
1 . Inspect AC power supply plug and cable for damage .
2 . Inspect case, keypad and mechanism for damage .
3 . Check Start up self-test operation is correct .
4 . Check for activation of both the alert indicator and audio function during the Pump start-up .
Clean the Pump by wiping over with a lint-free cloth lightly dampened with warm water and a
standard disinfectant/detergent solution .
BDDF00160 Issue 1
Alaris™ GW Volumetric Pumps
31/40
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents