Immerse cooling coil in fluid as shown in diagram below. Turn power switch (ELB) "ON" to start
operation.
1. Immerse cooling coil.
2. Turn power "ON".
・ Wait at least five minutes to resume after halting an operation (e.g. turning power off). DO
NOT turn power switch "ON" and "OFF" repeatedly within a short timeframe. Damage to
the refrigeration system may result.
・ Avoid operating unit continuously at fluid temperatures abive 35°C.
4. OPERATION PROCEDURE
12
Main Operation