ITRON RB 4000 Instruction Manual page 10

Gas pressure regulator
Table of Contents

Advertisement

Available languages

Available languages

Resetting of the shut-off valve with lever
reset (type SSV 8600)
– close the downstream stop valve
– slowly operate the resetting lever 27 clockwise
until the internal by-pass is open 26:
with this operation pressure fills the body
outlet 12, the control chamber 19 and the
downstream pipe, checking on the manometer
installed on the pipeline
Shut-off valve calibration
The shut-off valve is usually supplied with calibra-
tion values according to the order� Should be nec-
essary to modify the calibration value, it must be
considered that the modification can be effected
only within the calibration range of the spring in-
stalled, otherwise it is necessary to substitute it with
a suitable spring to be selected referring to the
provided tables�
10
– when the pressure indicated on the manometer
is stabilised, continue to move the lever 27 in
order to permit the connection of the control
lever 24; at this point the lever will remain stable
on the opening position�
After these operations, the shut-off valve is into
operation and it is possible to proceed slowly with
the opening of the downstream valve�
When the installed spring is appropriate to obtain
the required pressure, proceed as follows:
– over-pressure shut-off operation:
rotate in a clockwise direction the external screw-
ing ring increases the calibration value or in an an-
ticlockwise direction to reduce it�
– low-pressure shut-off operation:
rotate in a clockwise direction the central screw-
ing ring to increase the calibration value or in an
anticlockwise direction to reduce it�