Feed pipe clamp assembly (T25)

A feed pipe can be removed from the pipe clamps the following way:
1. Use a flat bladed screwdriver to pry the cover off the first corner (A).
2. Hold the clamp top with your hand and pry off the opposite corner
(B) with the screwdriver.
3. Pry off the other side of the pipe clamp with the screwdriver.
4. Take out the feed pipe.

Readjustment boom - general info

Before beginning boom adjustments, please go through this check list:
1. The sprayer must be well lubricated (see part about lubrication).
2. Connect the sprayer to the tractor.
3. Place tractor and sprayer on level ground (horizontal).
4. Unfold boom.
5. Set tilt angle of both wings to horizontal position.
6. Adjustment of hydraulic cylinders are done without pressure in the system.
±
WARNING! No one is allowed to be under the boom while adjustment is carried out.

Alignment of center and inner wing sections (All booms)

1. Unfold the boom and check alignment of the inner section with
the center section.
2. If adjustment is necessary, relieve pressure from the cylinder by
folding the boom a few inches.
3. Disconnect cylinder rod eye (A) from the inner section. Note that
some cylinder rods have a machined flat which can be used for
adjustments. If using this one for adjustment, leave the rod eye
pinned to the boom.
4. Loosen jam nut (B) and adjust the length of the rod eye (A).
IN = to move the boom forward
OUT = to move the boom rearward
5. Tighten the jam nut (B) again. (Reattach the cylinder rod to the
boom again, if it has been loosened).
6. Pressurize the cylinder to check boom alignment.
6 - Maintenance
6.5