Maneuvering of the SPB booms - (Ranger with ISOBUS)

To unfold the boom, do the following:
1. Press switch (H) to raise the boom clear of the transport brackets.
2. Press switches (B) and (D) to lower individual tilt rams.
3. Press switches (4) and (6) to unfold both wings simultaneously.
4. If only one side of the boom is to be used for spraying, first unfold
the boom completely. Then press switch (3) or (5) to fold the
desired side back in. Turn off the spray sections for the folded side
on the spray control unit.
5. Press switch (I) to lower the boom to correct height above crop or
ground level.
To fold the boom, do the following:
1. Before attempting to fold the boom back into transport position, it
must be raised all the way to the top by pressing switch (H). This
will enable the rear cylinder transport locks.
2. Press switches (3) and (5) to fold the boom.
3. Press switches (A) and (C) to raise the individual tilt rams. The boom
can now be lowered into the transport brackets.
4. The rear cylinder transport locks will automatically engage when
lowering the boom after it has been raised all the way to the top.
To disengage the rear transport lock, simply raise the boom back
up a few inches and then lower it again.
±
WARNING! Ensure that the rear cylinder transport locks are properly engaged before transport.
±
WARNING! The folding functions (switches 3 - 6) must only be operated when the sprayer is stationary! Failure to do
so will damage the boom.
±
WARNING! Never attempt to fold boom to transport position when wings are tilted. Always let wings down to
horizontal position prior to folding.
±
WARNING! Never attempt to work on or around wing section when tilted up.
±
WARNING! Unexpected boom movements may occur if wings are tilted when folding.
±
WARNING! Never use tilt function when boom is folded into transport position.
ATTENTION! Only unfold and fold the boom on level ground.
ATTENTION! The SPB-HZ booms cannot be operated with the tractor's hydraulic levers.
ATTENTION! It is not advisable to go directly from transport position to spray position with one side only. Both wings
must first be completely unfolded and then one side folded back in.