Maneuvering Of The 120'/90' Dual Fold Spc Booms - (Navigator With Isobus) - Hardi EAGLE SPB BOOM Operator's Manual

Hide thumbs Also See for EAGLE SPB BOOM:
Table of Contents

Advertisement

5 - Operation

Maneuvering of the 120'/90' Dual Fold SPC booms - (Navigator with ISOBUS)

To unfold the boom, do the following:
1. Press switch (H) to raise the boom clear of the transport brackets.
2. Press switches (B) and (D) to lower individual tilt rams.
3. Press switch (4) to unfold the boom. Rear transport hooks
disengage automatically.
4. Press switch (I) to lower the boom to correct height above crop or
ground level. Boom will be at 90' working width.
5. For 120' working width, press switch (8) to unfold the 2nd outer
sections.
To fold the boom, do the following:
1. Start with boom at 90' working width. If necessary, fold 2nd outer
sections using switch (7).
2. Press switch (H) to raise the boom to highest possible position.
3. Press switch (3) to fold the boom. Make sure to fold the boom
against the vertical slide pads.
4. Press switches (A) and (C) to raise the individual tilt rams.
5. Press switch (I) to lower the boom until the rear transport hooks are
firmly engaged.
6. Press switches (B) and (D) to lower the individual tilt rams until they
rest on the transport brackets.
DANGER! Be careful to avoid electrical lines when folding/unfolding Dual Fold boom. Outer sections fold/unfold
vertically.
±
WARNING! Ensure that the boom is clear from the transport brackets before unfolding.
±
WARNING! The folding functions (switches 3, 4, 7 & 8) must only be operated when the sprayer is stationary! Failure
to do so will damage the boom.
ATTENTION! There are stop switches located in the hydraulic lines of Dual Fold booms to prevent accidental damage
by folding/unfolding the 2nd outer sections while in transport position. Switches (7) & (8) (vertical fold) will only
function when the inner wings (horizontal fold) are completely unfolded in the operating position.
ATTENTION! The 120'/90' Dual Fold SPC HZ boom cannot be operated with the tractor's hydraulic levers.
÷
Note: Single-sided folding of the 120'/90' Dual Fold SPC boom is not possible.
5.12
A
B
E
I
H
C
D
F
G

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eagle spc boom

Table of Contents