Procom ECON-A-4C Operating Instructions Manual page 22

Table of Contents

Advertisement

Mains Over
Econ-A can protect contactors from
Load
mains over load. If this setting is
enabled than the mains contactor
shall drop after the mains current
crosses the set limit for a
programmed duration
Mains O/L
The monitoring duration for the
Delay
above parameter before the fault is
triggered.
Contactor
In case of the unit placed under
Protection
manual mode of tripped due to a fault
condition and the mains voltage falls
below the safe limit of the contactor,
the contactor burns after chattering.
This can be avoided by enabling this
protection. If enabled the mains
contactor shall drop if the mains
voltage becomes unhealthy and the
contactor will again engage after the
mains voltage turns healthy
Mains Fail
Some application require the
generator to start on failure of one or
more phases
Other wants all the 3 phases to
1/3
become unhealthy before starting the
generator
ECON-A can handle both situations
GCB to
User programmable delay when the
MCB Delay
load is transferred from Generator to
Mains.
Recool
The time for which generator is
Time
allowed to run on no load before
switching off
Operating Instructions
Disable Disable*
2-9999Amps
5 Sec
1-999 Sec
Disable
Disable /
Enable
Any
Any Phase
Phase
Fail/
Fail
All Phase
Fail
2 Sec
1-10 Sec
30 Sec
0-999Sec
Page - 20

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ECON-A-4C and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Econ-a-aEcon-a-sEcon-a-m

Table of Contents