E-line VEL90F User And Installer Instruction Manual page 12

Table of Contents

Advertisement

INSTALLATION
Step 5
Locate the two securing brackets located on
the rear of the appliance. Unscrew both,
rotate 180 degrees and re-screw onto the
appliance as shown in the image.
Step 6
Fix the appliance to the wall using the hanging
rail supplied. Use appropriate fixings for the
wall type you are installing to. Ensure that the
bracket is fitted level. Lift the appliance and
offer it towards the bracket, aligning the 3 tabs
with the three slots on the rear of the appliance.
Once fitted, secure the appliance to the wall with
the two securing brackets on the rear of the appliance
using appropriate fixings for the wall type.
Step 7
Arrange the ceramic fuel. Distribute the vermiculite gravel evenly around the white plastic
fuel bed. Arrange the logs on top of the vermiculite. Position the log retaining rail around
the logs. See image below for guidance.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vel90pVel90c

Table of Contents