Scope Of Delivery - Waeco DC-Kit3 Installation And Operating Manual

Dc extension kit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
DC-Kit3.book Seite 25 Freitag, 13. Juni 2008 3:24 15
DC-Kit3
Ensure good ventilation. The inverter produces dissipated heat
which has to be diverted.
Always disconnect the power supply when working on the device.
3

Scope of delivery

Quantity Description
1
Charging current distributor
1
Inverter
1
Remote control for the inverter (including
connection cable)
1
Priority circuit
1
2-wire control cable for MCR9
(B1600, HB2500, CA2500)
1
2-wire control cable for B2200
1
Sensing cable for CA1000
1
Black supply line
(35 mm², 1.5 m long)
1
Red supply line
(35 mm², 1.5 m long)
1
Installation and operating manual
Before starting the system, check that all the parts belonging to the scope of
delivery are present.
Scope of delivery
Item number
ECL-102
MSK1500-012
MCR9
VS-230-2
4441300124
4441300129
4441300084
4441300120
4441300119
4445100350
25

Advertisement

Table of Contents
loading

Table of Contents