Download Print this page

Electrical Box - Daikin ATC50QRV16 Service Manual

5.0/6.0 kw class removal procedure

Advertisement

Electrical Box

3. Electrical Box
Warning
Step
1
Remove the screw, and
then the service cover.
2
Remove the 4 screws
on the terminal board
and disconnect the
connecting wire.
3
Remove the screw, and
then the wire fixture.
4
Unfasten the 3 hooks
and remove the
electrical box cover.
6
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Service cover
(R19782)
(R19783)
Terminal
board
Connecting
wire
Wire fixture
(R19784)
Electrical box cover
(R19785)
Si041257EC
Points
Removal Procedure

Hide quick links:

Advertisement

loading