Chapter 7 Vrr P10 Displaying Controller Set-Up Steps; Nova Lct-Mars Control System Instruction - Samsung VRR P10 Product Manual

Table of Contents

Advertisement

② indicates the main signal line
③ indicates signal cascade
Figure 6-2 Signal connection diagram
Product
VRR P10
Remarks:
The number of pixels carried on each main network cable of the sending box is
limited, and the actual project should refer to the corresponding signal connection.
Drawing connections.

Chapter 7 VRR P10 Displaying Controller Set-up Steps

This chapter mainly introduces the setup steps of the VRR P10 product control
software.

7.1 Nova LCT-Mars Control System Instruction

7.1.1 Load display profile
Double-click to open the NovaLCT-Mars software, as shown in Picture 7-1, click
"User"—"Advanced Login" to open the software setting interface, as shown in Picture
7-1
.
Picture
7-1
Daisy Chain(Cabinet Qty one main signal cable carry)
(575,000 pixels)46PCS-52PCS(650,000 pixels)
14 / 50

Advertisement

Table of Contents
loading

Table of Contents