Download Print this page

Advertisement

Quick Links

Videowall Installation Guide
This training is to provide technical competence and
flexibility to show partner's specific skills on products.
Feb. 2021
Global Tech Sales Group
Enterprise Business Team

Advertisement

loading

Summary of Contents for Samsung Videowall

  • Page 1 Videowall Installation Guide This training is to provide technical competence and flexibility to show partner’s specific skills on products. Feb. 2021 Global Tech Sales Group Enterprise Business Team...
  • Page 2 Disclaimer This content contains confidential information that is intended for the exclusive use of Samsung employees and authorized partners. Any unauthorized use of this video is unlawful and all authorized persons have an obligation of confidentiality.
  • Page 3 Content 1. Preparation for Installation 2. On Installation 3. Thermal Guide...
  • Page 4 1. Preparation for Installation...
  • Page 5 1. Preparation for Installation : 1) Visual inspection • Please use the bottom box during the check • Please check the panel condition right after un-boxing and connecting source signal to the screens...
  • Page 6 1. Preparation for Installation : 2) Rotation • To use the product in portrait orientation, rotate it clockwise...
  • Page 7 1. Preparation for Installation : 3) Non-Installation Condition • Do not use this model installed on a ceiling, floor, or table • Do not use this model inclined backward or forward...
  • Page 8 1. Preparation for Installation : 4) Ventilation(1/2) • Installation on a Perpendicular wall...
  • Page 9 1. Preparation for Installation : 4) Ventilation(2/2) • Installation on an Indented wall ※For further ventilation Information for Video Wall, please refer to the Thermal guide on Appendix.
  • Page 10 2. On Installation...
  • Page 11 2. On Installation : 1) Un-boxing guide • After detaching 4 Box Holders at bottom, • After detaching 4 Box Holders left & right Pull the upper box upward Pull the boxes forward & backward UDE-A/B,UHF-E,UMH-E, VHR-R UHN-E,UMN-E Unboxing by using the previous way (mentioned left) can be used, but the recommendation is this way as less impact possibility to the product...
  • Page 12 2. On Installation : 2) Important Notice Seal ※ It is considered as “On Installation” stage when attaching the Wall Bracket Assy. So, if the Seal is broken, all the following issues are under the Installer’s responsibility...
  • Page 13 2. On Installation : 3) Wall-mounting • 2 persons should move & install the product - Use the handle when moving - Do not touch the panel & bezel when moving • Panel Protection Sheet should be detached right before the installation - Detach it from upward to downward direction - The Sheet can be used as mat...
  • Page 14 2. On Installation : 4) Cautions during handling • Be cautious on impact, especially the edges of the product...
  • Page 15 2. On Installation : 5) Detaching the sponges (VHR-R) • VHR-R has the sponges on four faces in bezel side • Detach them before installing...
  • Page 16 2. On Installation : 6) Reserve the GAP when installing(All products) • Use the GUIDE(see below, attached on the panel) to reserve the Gap between products • VHR-R has the sponges on four faces in bezel side • Use handles on the rear side of a screen as depicted in the picture below while moving...
  • Page 17 2. On Installation : 6) Reserve the GAP when installing(VHR-R) • Detach the Black Gap Tape Guide in horizontal direction...
  • Page 18 2. On Installation : 7) Cautions During Stacking(1/2) • The products on centers should be always located on center side • Bottom center → Bottom right or left → Upper center → Upper right or left...
  • Page 19 2. On Installation : 7) Cautions During Stacking(2/2) • Do not stack two products simultaneously • Do not hold the bezel when stacking • Do not stack the upper product forward direction, all should be upright with 90 degree...
  • Page 20 2. On Installation : 8) Wall-mount Alignment • Be cautious to prevent panels from colliding each other and being damaged when adjusting panel positions in X,Y,Z-directions • Be cautious to not push too strong when using Push-Pull Wall-Mount...
  • Page 21 2. On Installation : 9) Video signal cables • Use the cables packed along with the products • Use the cables officially certified and with below length recommendation - 55inch product: ~2 meters - 46inch product: ~1.5 meters DP cable HDMI cable •...
  • Page 22 3. Thermal Guide...
  • Page 23 3. Thermal Guide...
  • Page 24 - Min. distance between ceiling and top of screens should be greater than b mm - Min. distance between ground and bottom of screens should be greater than b mm ※ In case of bigger matrix than 5x5, contact local Samsung representative...
  • Page 25 3. Thermal Guide...
  • Page 27 Appendix: Thermal Guide for Single screen...