Viessmann VITODENS 242-F Installation And Service Instructions Manual page 28

3.2 to 26 kw gas condensing/solar storage combi boiler gas council no. 41-819-18; 41-819-19 natural gas and lpg version
Table of Contents

Advertisement

Installation sequence
Installing the boiler
!
Please note
Excessive test pressure may
damage the boiler and the gas
valve.
Max. test pressure 150 mbar
(15 kPa). Where higher pres-
sure is required for tightness
tests, disconnect the boiler
and the gas valves from the
gas supply pipe (undo the fit-
ting).
28
(cont.)
3. Vent the gas line.
For conversion to a different gas type
see page 53

Advertisement

Table of Contents
loading

This manual is also suitable for:

B2ua

Table of Contents