Internal Extensions - Viessmann FB2B Installation And Service Instructions Manual

4.8 to 26 kw gas condensing/solar storage combi boiler natural gas and lpg version gas council no.: 47-819-18 19 kw 47-819-19 26 kw
Table of Contents

Advertisement

Control unit
(cont.)
Boosting DHW heating
The booster heating function is activated
if a switching period is selected for the
fourth time phase.

Internal extensions

Internal extension H1
The internal extension H1 is integrated
into the control unit casing. The cylinder
primary pump is connected to relay out-
put sK.
Function description
The set temperature value for the heat-
ing boost is adjustable in coding address
"58".
An external safety valve can be connec-
ted to gD
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 242-f

Table of Contents