Engine - Doosan D35S-5 Disassembly/Assembly

Vehicle system
Hide thumbs Also See for D35S-5:
Table of Contents

Advertisement

7. Support the engine with a hoist and tooling (B).
8. Support transaxle assembly with a floor jack and
wood block.
9. Remove housing cover.
Remove bolts (13) that hold the converter to the
flywheel.
NOTE: At this point, make a final check to be sure
all removals and disconnections have been made
from the transaxle.
10. Remove bolts (14) and nuts from the converter
housing.
11. Use the floor jack to move transaxle assembly
from beneath the machine.
12. Install transaxle in the reverse order of removal.
13. Bleed the brake system.
Refer to the topic "Brake System Air removal" in
the Testing and Adjusting section of Vehicle
Systems.
14. Fill all fluids to their correct levels.
End By :
a. Install floor plate.
Vehicle Systems
b. Install mast *
* Refer to the Mast System Disassembly &
Assembly Section for further information.

Engine

Remove & Install Engine
Tools Needed
Link Bracket
NOTE: Procedures for LP gas and diesel engines
are all similar. The engine shown in the following
illustrations is for diesel engine.
Start By :
a. Remove overhead guard *
b. Remove hood (with seat) assembly *
c. Remove counterweight *
d. Remove floor plate.
e. Remove hydraulic control valve *
* Refer to the topics "Overhead Guard", "Hood (with
seat) Assembly", "Counterweight" and "Hydraulic
Control Valve" in this module.
1. Disconnect all hoses from radiator (3). Loosen
bolts (1) and (2) and remove radiator (3).
58
A
1
Disassembly & Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents