Preparations; Installation Site; Installation; Appliance Installation - STIEBEL ELTRON SNU 5 SLI Operation And Installation Manual

Open vented non-pressurised small water heater
Table of Contents

Advertisement

INSTALLATION

Preparations

8.
Preparations
f Flush the water line thoroughly.
f
Water installation
A safety valve is not required.
Taps/valves
Sealed unvented taps are not permitted.
f Install an open vented tap.
f
8.1

Installation site

Material losses
!
Install the appliance in a room free from the risk of frost.
Material losses
!
Mount the appliance on the wall. The wall must have a
sufficient load-bearing capacity.
Note
The appliance is only suitable for undersink installation.
The water connections of the appliance point upwards.
Note
Ensure that the appliance is freely accessible for main-
tenance work.
Always install the appliance vertically and near the draw-off point.
°C
85
35
65 Eco
55
°C
85
35
65 Eco
55
18
| SNU 5
9.
Installation
9.1

Appliance installation

f Mark out the drill holes using the installation template (see
f
middle part of these instructions).
f Drill the holes and insert suitable rawl plugs.
f
f Secure the wall mounting bracket using suitable screws.
f
f Hang the appliance on the wall mounting bracket.
f
Note
Surplus cable can be stored in the cable compartment.
9.2

Water connection

Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
Material losses
!
Counterhold with a suitable spanner when tightening
fittings.
22
19
www.stiebel-eltron.com

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Snu 5 sli ausSnu 5 sl 1 kw

Table of Contents