Curing time for general conditions
Temperature
of the base material
40 °C
30 °C to 39 °C
20 °C to 29 °C
15 °C to 19 °C
10 °C to 14 °C
5 °C to 9 °C
For dry concrete curing times may be reduced according to the following table.
For installation temperatures below +5 °C all load values have to be reduced according to the load
reduction factors given below .
Temperature
of the
base material
40 °C
30 °C
20 °C
15 °C
10 °C
5 °C
0 °C
-5 °C
09 / 2014
Data according ETA-04/0027, issue 2013-06-26
Working time in which anchor
can be inserted and adjusted t
Curing time for dry concrete
Additional Hilti technical data
Working time in which
anchor can be inserted
and adjusted t
12 min
12 min
20 min
30 min
90 min
120 min
3 h
4 h
These pages are part of the Anchor Fastening Technology Manual issue September 2014
gel
12 min
12 min
20 min
30 min
90 min
120 min
Reduced curing time
before anchor can be
fully loaded t
gel
4 h
8 h
12 h
18 h
24 h
36 h
50 h
72 h
Hilti HIT-RE 500 mortar
with HIT-V / HAS rod
Curing time before anchor
can be fully loaded t
4 h
8 h
12 h
24 h
48 h
72 h
Load reduction factor
cure,dry
1
1
1
1
1
1
0,7
0,6
cure