Eia-485 N - Reliable Controls MACH-ProCom User Manual

Table of Contents

Advertisement

F
33: M
IGURE
The Initialization String field value is utilized by the MACH-Pro(Web)Com to initialize an
external modem connected to this port. The default string is shown, however this may be
modified, if required.
SMART-N
ET
Enabling the Enable X-Port Access field creates an internal physical connection between
MS/TP Net and two poles of the SMART-Net port. If enabled, operators can connect their
RC-Studio workstation to the SMART Net port, or to any SS-L wired to the SMART Net port,
using the X-Port-2
BACnet Sub A.). If disabled, MS/TP-Net is isolated from the SMART-Net bus, preventing X-
Port-2 communications and eliminating a possible source of EIA-485 network noise in the
system.
F
34: SMART-N
IGURE
MS/TP-N
ET
The Protocol field can be set to BACnet Main, BACnet Sub A, Modbus Master, Modbus
Slave, or Disabled.
F
35: MS/TP-N
IGURE
34
C
ODEM
ONFIGURATION DIALOG BOX
convertor (providing MS/TP-Net is configured for BACnet Main or
ET GROUP
ET GROUP
®
 2007 − 2015 Reliable Controls
Corporation. All rights reserved.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MACH-ProCom and is the answer not in the manual?

Questions and answers

Related Products for Reliable Controls MACH-ProCom

This manual is also suitable for:

Mach-prowebcom

Table of Contents

Save PDF