Download Print this page
Tuthill Sotera TS06AS83 Installation, Operation & Parts Manual
Tuthill Sotera TS06AS83 Installation, Operation & Parts Manual

Tuthill Sotera TS06AS83 Installation, Operation & Parts Manual

Anodized aluminum, electronic dispenser meter

Advertisement

Quick Links

Installation,
Operation &
Parts Manual
Assembly No.,
S/No.: __________________
The flow meter shipped under this general manual, has specifically:
Non-Compensated
Single
__ TS06AS83
Twin
__ TS06AS84
for register
__ TS06AE83
with EMR³
__ TS06AE93
with ELNC
__ TS06AE71
__ TS06AE72
__ TS06AE73
ACCESSORIES
Backpressure Valve
Strainer
Vapor Eliminator
Differential Valve
TS06A, LPG
Anodized Aluminum,
Electronic Dispenser Meter
With Thermo Well
REGISTER
None
RAD register adaptor
EMR³ Register
ELNC Register
TS06AS86
with thermo well
__ TS06AS86
__ TS06AS88
__ TS06AE86
__ TS06AE96
TS06LPG 6/22/2012

Advertisement

loading
Need help?

Need help?

Do you have a question about the Sotera TS06AS83 and is the answer not in the manual?

Questions and answers

Summary of Contents for Tuthill Sotera TS06AS83

  • Page 1 TS06A, LPG Anodized Aluminum, Electronic Dispenser Meter Installation, Operation & TS06AS86 with thermo well Parts Manual Non-Compensated With Thermo Well Assembly No., Single __ TS06AS83 __ TS06AS86 Twin __ TS06AS84 __ TS06AS88 for register __ TS06AE83 __ TS06AE86 with EMR³ __ TS06AE93 __ TS06AE96 with ELNC...
  • Page 2: Table Of Contents

    INDEX Safety Procedures Installation & Operations Torque & Wrench Chart Meter Maintenance 7-10 Disassembly Flow Meter Inlet Check Valve Strainer Vapor Eliminator Differential Valve Parts List: Meter & Strainer Differential Valve Inlet Check Valve Vapor Eliminator Troubleshooting SCL (Pulser Assembly) 15-16 Meter calibration...
  • Page 3: Safety Procedures

    This manual provides warnings and procedures that are intended to inform the owner/operator of the hazards present when using the Tuthill Transfer Systems, TUTHILL meters and other products. The reading of these warnings and the avoidance of such hazards is strictly in the hands of the owner/operator of the equipment.
  • Page 4: Installation & Operations

    Installation & Operation Installation: In critical installation, block valves and by-pass lines are recommended. This allows the meter to be ser- Before Start-up of the Meter, make certain: viced without interruption of flow in a critical process  The meter is properly mounted, secured and piped application.
  • Page 5: Torque & Wrench Chart

    The meter is not designed to operate on air, but the design stalling pumps. Give particular attention to factors like: use and materials of construction of the TUTHILL meter allows of foot valves, pipe size to the inlet and conformance to net...
  • Page 6 If the receiving instrument (register) is more than 200’ (60 m) cable distance from the flow meter, an amplifier is required on the pulse signal. If this option was not ordered, please consult with Tuthill prior to start-up. Both pins covered: 5VDC Regulated 1 pin exposed: 5.5 - 12 VDC...
  • Page 7: Flow Meter

    Installation & Operation continued TS06A with SCL & ER9044 (ELNC-1141) register, AC powered through EL2057 ELPS-2057 AC power supply & barrier EL0300-5 SCL inside flow meter front cover This drawing does not guarantee compliance for intrinsically safe apparatus. Refer to CD1000, CD1001 and State &...
  • Page 8 Installation & Operation continued TS06A with SCL & ER-9044-2 (ELNC-1141E) register, with Backlight Display & 10:1 Pulse, AC powered through EL2057 This drawing does not guarantee compliance for intrinsically safe apparatus. Refer to CD1000, CD1001 and- State & National electrical codes. Cable lengths are limited by entity parameters.
  • Page 9 Installation & Operation continued Theory of Operation; pass lines. The TUTHILL meters LPG metering system combines an When properly installed, this line must permit free flow in oval gear positive displacement meter, differential valve, either direction. If the vent line is closed the meter will not strainer and vapor eliminator in one assembly.
  • Page 10 Service Depart-  ment at TUTHILL meters for assistance if this occurs. As product is bleeding from the bleed valve, slowly reo- pen and close the valve/nozzle on the discharge line.
  • Page 11 Flow Meter Maintenance...
  • Page 12 Flow Meter Maintenance Danger!! Danger!! Danger!! Relieve all internal pressure before servicing. Line pressure must be 0.0 PSI Serious injury or death form fire or explosion could result from maintenance of an Meter Disassembly:   Install a new oval gear set (17) if necessary. Gears If your meter is equipped with an electronic register, should be perpendicular to each other.
  • Page 13: Inlet Check Valve

    Flow Meter Maintenance Inlet Check Valve Service: (Optional component)   Inspect the slide valve. Remove and build–up of salts or Disconnect the outlet piping from the meter assembly at dirt which may cause the valve to stick. The valve the differential valve outlet flange.
  • Page 14 Flow Meter Maintenance 3/4” Back Check Valve Assembly (Optional) Item # Qty Description Part # 1 Complete Backcheck Valve Assy. VP3075 1 Piston, 3/4" Backcheck Valve MP4001 1 Spring MS8031 1 "O" Ring SL3114-UL 1 Body, 3/4" Backcheck Valve MP3075-1 1 Poppet, 3/4"...
  • Page 15 Exploded View...
  • Page 16: Vapor Eliminator

    Parts List SINGLE TWIN Item # Description Relief Valve MS8400 MS8400 Flange 1" FNPT (ALUM) MP2568 MP2568 Flange 1" FBSP (ALUM) MP2569 MP2569 1/4-20 x 5" Hex Bolt FS2910 FS2910 Cover, Vapor Eliminator MP2561 MP2561 Housing, Vapor Eliminator MP2565 MP2565 O-Ring, Buna SL3156 SL3156...
  • Page 17 Trouble Shooting Problem Probable Cause and Solution  Leakage from seal cover. Seal has been damaged due to shock  Cover bolts have not bee tightened sufficiently  Replace seal and /or re-torque bolts Product flows through meter but the regis- ...
  • Page 18 The SCL may be LINEARIZER MODE: used in conjunction with other Tuthill electronics to solve If a metering device is not producing an output within the many of your electronic interface requirements.
  • Page 19 Flow Meter Calibration  METER CALIBRATION: Finally:   Flow meter re-calibration should be on a volume Re-seal the flow meter. equal to 1 minute of flow at maximum flow rate.  Enter date and % correction on the permanent flow ...
  • Page 20 NOTES...