Bosch SE 60 LSNi Installation Manual
Bosch SE 60 LSNi Installation Manual

Bosch SE 60 LSNi Installation Manual

Smartkey blocking unit

Advertisement

Quick Links

SE 60 LSNi SmartKey Blocking Unit
Security Systems
Installation manual
SE 60 LSNi
EN

Advertisement

Table of Contents
loading

Summary of Contents for Bosch SE 60 LSNi

  • Page 1 SE 60 LSNi SmartKey Blocking Unit Security Systems Installation manual SE 60 LSNi...
  • Page 2: Table Of Contents

    Table of contents Chapter Page System description System overview....................3 Variants and kits for the SPE blocking element ............. 3 Description of the connections to the control unit ..........4 Installation instructions Mounting the system components ................. 6 Mounting of magnet contact and bolt contact ............6 Connecting the control panel and optional components ........
  • Page 3: System Description

    System description System overview The SmartKey blocking unit is used to mechanically lock doors. The SE 60 LSNi control unit controls the SPE blocking element depending on the state of the bolt contact and/or the intrusion control panel (control panel armed/disarmed). When the door is closed (bolt contact is activated), the bolts of the SPE blocking element are automatically engaged.
  • Page 4: Description Of The Connections To The Control Unit

    System description Description of the connections to the control unit The connections to the control unit have different functions. There are inputs and outputs as well as plug-in terminals. For the scope of the basic functions, the inputs and outputs must be laid out according to a specific scheme.
  • Page 5 System description Description of the connections to the control unit The connections to the control unit have different functions. There are inputs and outputs as well as plug-in terminals. For the scope of the basic functions, the inputs and outputs must be laid out according to a specific scheme.
  • Page 6: Installation Instructions

    Installation instructions Mounting the system components Observe the following during mounting: • Only use shielded cables. • The standard precautions for C-MOS technology must be taken when handling PCBs This also applies for soldering work. Wear a grounding armband when working on the control panel Mounting the control unit •...
  • Page 7: Connecting The Control Panel And Optional Components

    Installation instructions Connecting the control panel and optional components Make sure that the control panel is disconnected from the power supply. Connect the control unit and the optional components according to the relevant interface. Address switch: The address switch is used on LSN control panels currently being planned. The address switch does not need to be set on any of the LSN control panels currently available.
  • Page 8: Programming

    Installation instructions Programming Programming of the SE 60 LSNi and all other system components is performed by the corresponding program on the control panel. SPE blocking element function test Turn on the power supply • Before turning on the power supply, make sure that bridge B1 is inserted in the control unit •...
  • Page 9: Fault Elimination

    Fault elimination First, thoroughly check the following: • Are the components correctly wired? • Is there a short circuit/wire breakage? • Are the components supplied with power? • Is bridge BR1 correctly inserted in the control unit? Problem Possible cause(s) Elimination Bolt does not extend/ •...
  • Page 10: Notes On Maintenance And Service

    Notes on maintenance and service General Maintenance and inspection work must be carried out at specified intervals by appropriately qualified personnel. In all other respects, the conditions of DIN VDE 0833 apply for this work. Inspection and maintenance • Function test of the tamper contact in the control unit •...
  • Page 11: Replacing The Bolt In The Spe Blocking Element

    Notes on maintenance and service Replacing the bolt in the SPE blocking element (for example if the bolt breaks or if the bolt can no longer be moved) The bolt can be replaced while the system is running (while it is disarmed). Proceed as follows with the help of the appropriate mounting instructions: 1.
  • Page 12: Technical Data

    Due to the time (class C) for whole shift caused by the LSN, up to four system SE 60 LSNi can be activated within 200 ms. Laws/Standards/Guidelines The system fulfills all the requirements resulting from the relevant laws, standards...
  • Page 13 Notes...
  • Page 14 Notes...
  • Page 15 Notes...
  • Page 16 Bosch Security Systems For more information, please visit www.boschsecurity.com Bosch Sicherheitssysteme GmbH Robert-Bosch-Ring 5 85630 Grasbrunn Germany F.01U.341.973 A4 04.2017...

Table of Contents