Organize.your.tools; Preparing.the.range.hood - Pacific AK-9800 User & Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation: Organize Your Tools
Organize Your Tools
Before starting installation the following tools and materials will be required:
• Electric Drill;
• 1/" (13 mm) drill bit for drilling pilot holes;
• 1 1/" (3mm) wood bit for drilling electrical wiring access hole;
• Straight blade screwdriver;
• Pliers;
• Tape measure and pencil; and
• Electrical wire and supplies to conform with local electrical codes.
For installation under cabinets with recessed bottoms:
• Two only " (wide) X 1" (thick) X 1" (length) (51 x 5 x 30 mm) wood strips to act
as filler pieces;
• Nuts and bolts to mount the filler strips and range hood; and
• Suitable saw to cut the filler strips to length.
Preparing the Range Hood
Unpack the range hood and check the contents against the packing list
provided with your unit. The items shown below are for the EP-3030:
2
1
3
6
10
9
Page 1
13
5
7
8
12
4
11
#
Description
1
Grilles ()

Residue cups ()
3
Grill caps ()

6" starting collar
5
Wiring connectors
6
Transition Adapter
7
Securing screws
8
Mounting collars
9
Starting Collar
10
Round transition adapter
11
Vent blanking plate
1
Warranty & Manual
13
Bottom splash shield

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr-3330Ep-9800Pr-3030Ep-3030Ep-3330

Table of Contents