Daikin FTE09MV2S Service Manual page 20

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Removal of PCBs
Step
7. Remove the control PCB.
1
Release the 2 lower
hooks.
2
Lift up the bottom of the
control PCB and pull it
out.
3
The figures show the
names of the PCB
component parts.
18
Procedure
Control
PCB
Hook
Hook
[S5]
[S32]
[S28]
[S29]
Hook
(R13171)
Hook
(R13172)
[S1]
[S1]: AC fan motor
[S5]: thermal fuse
[S6]: swing motor
[S7]: AC fan motor (Hall IC)
[S27]: display PCB
[S7]
[S32]: indoor heat exchanger
[S6]
[S27]
(R12699)
[S26]
[S26]: control PCB
[S28]: signal receiver PCB
[S29]: display PCB
(R12737)
Si041138
Points
When reassembling the
control PCB, make sure that
it is fixed by 2 upper hooks.
thermistor
LED3 is not mounted.
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents