Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Si041138
Step
2. Remove the horizontal
blade (small).
Unfasten the center
1
shaft while bending the
horizontal blade (small)
slightly.
Unfasten the left shaft.
2
3
Unfasten the right shaft.
Removal Procedure
Procedure
Horizontal blade (small)
Key alignment
Removal of Horizontal Blades / Vertical Blades
(R4859)
(R4330)
There is a key alignment at
the right shaft. When
reassembling, insert the right
shaft first while turning.
After inserting the right shaft,
mount the horizontal blade to
the center shaft and then to
the left shaft.
(R15361)
Points
9

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FTE09MV2S and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Fte12mv2s

Table of Contents