Daikin FTE09MV2S Service Manual page 33

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Si041138
Step
3. Remove the bearing.
1
Remove the screw of
the left side panel.
2
Unfasten the 2 hooks
and remove the left side
panel.
Press the bearing from
3
outside.
4
Remove the bearing.
Removal Procedure
Procedure
Left side panel
Hook
Bearing
(R15465)
Hook
(R4415)
(R4416)
Removal of Fan Rotor
Points
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents