MGE UPS Systems 66244 User Manual page 27

Snmp/web minislot card snmp/web transverse card network management cards
Hide thumbs Also See for 66244:
Table of Contents

Advertisement

www.mgeups.com
4.1.3.1 Load shedding or sequential shutdown
It is possible to optimise backup time by shutting down non-priority equipment or sequencing the
shutdown of several devices.
Two shutdown criteria are possible:
1. Shutdown of outlets after a set battery back-up time (ShutOff Delay, programmable in UM-
Console, UM-Vision)
2. Shutdown of outlets at a given battery discharge level (ShutOff Level, programmable in UM-
Vision)
It is possible to specify values for both criteria. The first criterion reached will initiate server shutdown.
4.1.3.2 Sequential startup
It is possible to delay outlet power-on to reduce inrush currents on startup or to sequence the startup
of several devices.
Outlet startup after a given time is based on startup of the main outlet (Restart delay, programmable in
UM-Console, UM-Vision)
T H E
U N I N T E R R U P T I B L E
Network Management Cards – User Manual
P O W E R
P R O V I D E R
34003676EN/AA
Page 27/42

Advertisement

Table of Contents
loading

Table of Contents