RGBlink D6 User Manual page 5

Hide thumbs Also See for D6:
Table of Contents

Advertisement

Unpacking and Inspection
Before opening D6 processor shipping box, inspect it for damage. If you find any damage, notify
the shipping carrier immediately for all claims adjustments. As you open the box, compare its
contents against the packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during
shipping. If there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your D6 should be clean, properly lit, free from static, and
have adequate power, ventilation, and space for all components.
D6
User Manual
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the D6 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents