Installing Supply Lines To The Condenser Unit (Sp950Tonly); Adjusting The Cover Frame; Fastening The Cover Frame - Dometic COOLAIR RT780 Installation Manual

Universal installation 1 (perforation system attachment) air conditioners
Hide thumbs Also See for COOLAIR RT780:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
7.8
Installing supply lines to the condenser unit
(SP950Tonly)
Observe the following instructions when installing the supply lines:
• Also observe the installation instructions for the condenser unit.
• The maximum cable length between the evaporator and condenser unit is
4.20 m (fig. e).
• When installing and bending supply lines, avoid narrow radii. Use a suitable
round object as a bending aid. A radius which is too narrow will buckle the
refrigerant line, and the parking cooler will be inoperable.
➤ Shorten any supply line which is not needed by bending a curve.
➤ Apply packing compound (fig. e 1) to prevent water entering between the
rear wall of the truck and the clip.
I
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole), you can
also apply the clip using a suitable adhesive. Observe the instructions provided
by the adhesive manufacturer.
➤ Fasten the supply lines to the rear wall of the truck using the clips provided
(fig. e).
➤ Insert the corrugated piping in the holder provided (fig. e 2).
➤ Put the cover on (fig. e 4).
7.9

Adjusting the cover frame

When installed, the outlet unit must protrude approx. 6 mm over the cover
frame.
➤ Cut the cover frame to suit the properties of the vehicle (fig. c).
7.10

Fastening the cover frame

A
NOTICE!
Screw the screws in carefully order not to damage the cover frame.
➤ Fix the cover frame in place as illustrated (fig. d).
14
CoolAir RT780, SP950T
EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Coolair sp950t

Table of Contents