Flowmeter In-Feed Chutes

The flowmeter in-feed chute delivers the material from the bin or feeder discharge to the
flowmeter flowguide. The ideal in-feed chute pre-conditions the material flow to minimize
the effect of abrasion, velocity variation, feeder discharge trajectory variation, and
pulsing.
Feeder/Flowguide Transition
ShortFall Chute
<0.6 m (2ft)
Long Fall Chute
>0.6m (2ft)
7ML19985EQ01
reverse flowguide transition reverses direction of the
bin or feeder material discharge before the material
enters the flowmeter flowguide
reversing direction forces the material into a desirable
flow pattern rather than permitting material to be flung
from the feeder, directly into the flowguide
transition is especially important for high or variable
speed feeders
forward flowguide transition maintains the material in
baffle plate
the same direction between the bin or feeder discharge
and the flowmeter flowguide
transition is acceptable for a low and constant velocity
feeder
if a forward flowguide transition must be used for a high
or variable speed feeder application, install a baffle
plate
material in-feed chute where the bin or feeder
discharge to flowmeter flowguide fall is less than 0.6 m
(2 ft)
material velocity due to gravity minimumized
chute centreline and angle should coincide with that of
the flowguide, for a distance greater than or equal to
the flowguide diameter (before the flowguide inlet)
material in-feed where the bin or feeder discharge/
flowguide fall is more than 0.6 m (2 ft)
less desirable than the short fall chute because material
velocity is greater, increasing flowmeter component
abrasion
greater distances after chute angle changes required to
settle material into desirable flow patterns