Trane CVGF500 Installation, Operation & Maintenance Manual page 18

Gear-driven centrifugal water-cooled liquid chillers with adaptiview controls
Hide thumbs Also See for CVGF500:
Table of Contents

Advertisement

General Information
Installation Overview
For convenience, Table 1 summarizes responsibilities that are typically associated with the CVGF chiller
installation process.
Table 1. Installation responsibility chart for CVGF units
Requirement
Trane-supplied,
Trane-installed
Rigging
Isolation
Circuit breakers or non-fused
Electrical
disconnects (optional)
Unit-mounted starter
(optional)
Water piping
Pressure Relief
Relief valves
Insulation
Insulation (optional)
18
Trane-supplied,
Field-installed
Isolation pads
Spring isolators
Remote-mounted starter
(optional)
Temperature sensor
(optional outdoor air)
Flow switches (may be
field-supplied)
Field-supplied,
Field-installed
Safety chains
Clevis connectors
Lifting beam equipment, skates,
rollers, and other lifting
operations
Spring isolators
Circuit breakers or fusible
disconnects (optional)
Terminal lugs
Ground connection(s)
Jumper bars
BAS wiring (optional)
IPC wiring
Control voltage wiring
Chilled-water-pump contactor and
wiring
Condenser-water-pump contactor
and wiring
Optional relays and wiring
Thermometers
Water flow pressure gauges
Isolation and balancing valves
water piping
Vent and drain valves
Pressure relief valves (for water
boxes as required)
Vent line and flexible connector
Insulation
CVGF-SVX03B-EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cvgf1000Cvgf700

Table of Contents